The outside
of the house has received it first coat of paint.
The drywall is almost complete and marble window sills are
installed!
Our house is finally more than a skeleton.
Front of the house
The septic system is being installed in the front yard.
Special "washed sand" had to be shipped in for the
drain field.
The color in the photos vary, the true color is close to this
first photo.
House view of entry and drain field.
House view of entry and septic tank.
view of garage door where parking pad will be. View of driveway
path.
Driveway path. Tree on left the one that sustained hurricane
damage.
V iew of back yard from parking pad.
Well pump(white) can be seen at the back right side of lot
House from back yard. Driveway will be on the left side of
the house.
Back porch
Future area of a paved brick patio and screened lanai (maybe...)
|